资讯

  • 基于 SCPTU 测试的软土基坑开挖数值模拟研究

    中仿科技PLAXIS案例:基于 SCPTU 测试的软土基坑开挖数值模拟研究等,基于有限元数值模拟技术。PLAXIS软件代理商提供技术支持和培训。

    2026-03-13 iGeo

  • 利用云的力量:以前所未有的速度运行RS3模型

    中仿科技Rocscience RS3:利用云的力量,以前所未有的速度运行模型,云计算加速岩土分析。

    2026-03-13 iGeo

  • 基于强度折减法的库岸滑坡三维有限元分析

    The genetic mechanism and evolvement process of the reservoir bank landslide were discussed detailedly based onengineering exploration and analyzing environmental geological conditions. And some main factors effecting stability of the landslidewere analyzed emphatically. Through building a 3D FEM model of landslide, the stable situations of the landslide under varioussituations were considered based on the strength reduction method. The result shows that the landslide is steady under the naturalsituation. The front edge of the landslide will be drowned out when the reservoir retains water normally; the safety factor reduces andcan’t meet the requirements of norms. The landslide tends to be more dangerous under rainfall infiltration and rapid drawdown of thereservoir water level. And the landslide will be instable when water storage situation and earthquake situation were considered at thesame time. According to the preceding analysis, the treatment measures of cutting slope and reducing load were presented. Thelandslide is steady under various conditions after being controlled. The relevant conclusions and methods proposed take a good effectin landslide treatment.

    2024-12-04 iGeo

  • RocSlope2:全面的岩质边坡分析解决方案

    中仿科技Rocscience RocSlope2:全面的岩质边坡分析解决方案,楔形体、滑移面、支护设计一体化。

    2026-03-13 iGeo

  • 基于 Pasternak 地基模型的非线性土抗力−桩 身侧向位移曲线在基坑支护桩中的应用

    中仿科技PLAXIS案例:基于 Pasternak 地基模型的非线性土抗力&minus等,基于有限元数值模拟技术。PLAXIS软件代理商提供技术支持和培训。

    2026-03-13 iGeo

  • 基于Drucker-Prager Cap模型的装配式混凝土箱涵节段滞回性能研究

    在利用有限元软件 ADINA 对预制钢筋混凝土箱涵结构进行滞回性能分析中,计算往往比较难收敛,而 ADINA 中提供的基于 Drucker-Prager 屈服条件、拉伸截断、帽盖硬化等准则的 Drucker-Prager Cap 模型,在对混凝土进行数 值分析时收敛容易,且计算速度较快,并通过比较,发现采用基于该模型建立的数值模型计算得到的滞回曲线与试 验得到的结果吻合程度较高,模拟结果较为准确。这一成果可以通过数值模拟的方式获得预制钢筋混凝土箱涵的 滞回曲线与相关数据,可应用于预制箱涵节段抗震计算和设计。

    2024-12-04 iGeo

  • Slide3和RS2:露天矿边坡破坏反分析的首选工具

    Rocscience Slide3和RS2以其可靠和强大的极限平衡和有限元边坡稳定分析而闻名。因此,它们成为J.M.的首选工具也就不足为奇了。卡布亚等人在一篇论文中提出了一个数值反分析的边坡破坏发生在露天矿在加拿大。

    2024-08-06 iGeo

  • 基于 HS-Small 模型的基坑近接桥桩开挖 变形影响区研究

    中仿科技PLAXIS案例:基于 HS-Small 模型的基坑近接桥桩开挖 变形影响区研等,基于有限元数值模拟技术。PLAXIS软件代理商提供技术支持和培训。

    2026-03-13 iGeo

储罐的动特性分析